Products & Drawings

Deepwater Riser & Tubular Recovery Systems

Engineering high-reliability subsea tubular protection and riser recovery systems for deepwater decommissioning operations.

The Innovation

Our patent-pending modular riser and tieback recovery guide wraps securely around the base of a subsea riser connector or tieback connector. Engineered using nominal data book dimensions and reference design parameters, the two-piece conical shroud provides a smooth, ramped, and tapered sleeve that allows the connector and flange to cleanly reenter the platform keel—eliminating square shoulders or exposed studs from getting hung up.

  • Cross-Manufacturer Compatibility: Flexibly accommodates varying manufacturer riser ODs, flange geometries, and protruding stud configurations.
  • Independent Installation: Installed entirely independently—requiring zero operational assistance or footprint from the SPAR, TLP, or drilling rig.
Assembled yellow two-piece modular conical riser recovery guide shroud with flush locking band slots.
Assembled modular two-piece conical recovery shroud designed to center and guide subsea connectors smoothly through platform keels.
Red urethane split-section riser recovery guide half-shell showing curved bore and bottom flange cutouts
Interior profile of the modular urethane half-shell engineered to wrap around the connector base and clear protruding studs.

Optimized Workscopes & Applications

Decommissioning Subsea Risers

Engineered to center and guide complex riser tiebacks or subsea connectors smoothly through platform keels during deepwater decommissioning.

Decommissioning SPAR Risers

Eliminates multi-hour ballasting and trimming bottlenecks caused by unguided square-edge SPAR keels during heavy riser pulls.

Decommissioning TLP Risers

Prevents costly snagging of protruding studs and blunt connector flanges on Tension Leg Platform keels, protecting critical asset schedules.

Pulling Subsea Risers

Decouples subsea prep from the rig spread to remove expensive ROV support vessel day-rate standby across 3-to-7-day pull sequences.

Technical Specifications

  • Supported Connectors: Subsea riser & tieback connectors (custom-engineered to OEM flange profiles)
  • Material & Construction: High-strength marine polyurethane with flush mechanical locking bands
  • Deployment Method: ROV-installed two-piece hermaphroditic shroud (pre-disconnect)
  • Drawings & CAD: General arrangement & dimensional drawings available upon engineering request

Field Operations & Deployment Workflow

Split-section riser recovery guide halves showing internal bore, flange shoulder seat, and strap slot geometry
Split-section recovery guide halves showing internal bore, flange shoulder seat, and flush strap slots.
Subsea ROV placement showing two-section riser guide seated flush on riser OD and flange shoulder
Subsea ROV installing the two-section riser recovery guide flush on the riser OD and flange shoulder.
  1. Subsea Basket Prep: Support vessel loads the modular riser guides plus spares into a subsea basket and navigates to location.
  2. Independent Installation: The ROV installs the lightweight modular shroud halves around the selected connector and secures them with flush-mounted locking bands before the subsea connector is unlatched.
  3. Immediate Vessel Demob: The ROV support vessel departs location entirely, eliminating the full-rate ROV standby day-rate across the 3-to-7-day pull sequence.
  4. Autonomous Blind Pull: The smooth tapered conical guide centers and steers the studded flange smoothly through the blunt platform keel, saving significant rig time and eliminating keel-snag delays.
Riser and tieback pull sequence showing tieback-to-stress-joint flange, protruding studs, pre-disconnect guide installation, keel reentry, and TA Cap.
Multi-stage riser and tieback recovery sequence—from flange-to-stress-joint connection with protruding studs and pre-disconnect guide installation to guided keel reentry and TA Cap deployment.