Subsea Riser Recovery & Tieback Protection
Modular guides for deepwater keel reentry


Engineering high-reliability subsea tubular protection and riser recovery systems for deepwater riser recovery operations
The Innovation
Our patent-pending modular riser and tieback recovery guide wraps securely around the base of a subsea riser connector or tieback connector. Engineered using nominal data book dimensions and reference design parameters, the two-piece conical shroud provides a smooth, ramped, and tapered sleeve that allows the connector and flange to cleanly reenter the platform keel—eliminating square shoulders or exposed studs from getting hung up.
- Cross-Manufacturer Compatibility: Flexibly accommodates varying manufacturer riser ODs, flange geometries, and protruding stud configurations.
- Independent Advance Installation: Installed entirely independently—requiring zero operational assistance or footprint from the SPAR, TLP, or drilling rig.
Optimized Workscopes & Applications
Decommissioning Subsea Risers
Engineered to center and guide complex subsea tieback connectors and wellhead strings smoothly through platform keels during deepwater decommissioning.
Decommissioning SPAR Risers
Eliminates multi-hour ballasting and trimming bottlenecks caused by unguided square-edge SPAR keels during heavy riser pulls.
Decommissioning TLP Risers
Prevents costly snagging of protruding studs and blunt connector flanges on Tension Leg Platform keels, protecting critical asset schedules.
Pulling Subsea Risers
Decouples subsea prep from the rig spread to remove expensive ROV support vessel day-rate standby across 3-to-7-day pull sequences.
Why It Is Needed
During SPAR/TLP construction, fabrication capital is allocated entirely to production function rather than decommissioning ease—meaning the bottom of the platform keel typically features a square, unguided shoulder rather than an entry funnel.
During deepwater P&A, tieback disconnects, or decommissioning, pulling risers back through this unguided keel presents major subsea hazards. Exposed studs and blunt flange profiles can easily collide with the square keel edge, turning a blind pull into a multi-hour bottleneck (historical unguided pulls have faced upwards of 14 hours of ballasting, trimming, and jarring just to clear the keel).
Conventionally, operators absorb massive financial losses by keeping an expensive ROV support vessel on full day-rate standby ($150,000+/day) throughout a multi-day riser pull just to prevent hang-ups.
Field Operations & Deployment Workflow
- Subsea Basket Prep: Support vessel loads the modular riser guides plus spares into a subsea basket and navigates to location.
- Independent Installation: The ROV installs the lightweight modular shroud halves around the selected connector and secures them with flush-mounted locking bands before the subsea connector is unlatched.
- Immediate Vessel Demob: The ROV support vessel departs location entirely. This completely decouples subsea prep from the rig and eliminates the full-rate ROV standby day-rate across the 3-to-7-day pull sequence.
- Autonomous Blind Pull: Once the well is P&A’d and internal strings are pulled, the connector is unlatched. The rig performs an autonomous blind pull: the smooth tapered conical guide centers and steers the studded flange smoothly through the blunt platform keel, saving significant rig time and eliminating keel-snag delays.
Technical Specifications
| Parameter | Specification |
| Application | Deepwater Riser & Tubular Recovery / Keel Reentry |
| Deployment | ROV-Guided / Modular Mechanical Interlock |
| Dimensional Basis | Nominal Data Book / Reference Design Tolerances |
| Construction | Modular Steel / High-Performance Marine Polyurethane |